Project overview
Transparent quantity takeoff · update any input to recalculate
Material requirements
Auto calculatedAll figures are estimates derived from input geometry, construction elements, mix ratios and allowances—not a flat per-square-foot coefficient.
Cost allocation
PKRCalculation transparency
Review requiredProject details
All lengths in feet unless statedWall takeoff
Add each non-overlapping wall segment. Net length should exclude intersecting overlaps.
Doors and windows
Each opening is linked to a wall, subtracting brickwork and applicable plaster area.
Plan sketch Illustrative only
The sketch represents the building envelope only, not a scaled wall-by-wall architectural drawing. Wall measurements are controlled by the editable table above.
Concrete and foundation elements
Each element is measured individually as length × width × depth × count. Concrete thickness is entered in feet (5 inches = 0.4167 ft). Exclude beam/slab intersections from measurements to avoid double-counting.
Reinforcement bar takeoff
Only measured bars are included in steel tonnage. Enter actual cutting lengths including hooks/laps. Do not infer bar spacing or counts from covered area.
Other measured works
Foundations · plaster · floorMultan reference price sheet
Editable planning rates, not verified live dealer quotations.
Mixes & allowances
Bill of quantities
A transparent material and labour breakdown calculated from your project.